Ship faster, own your operations, and leave SAP behind.
How a $200M power transformer manufacturer replaces SAP with software it owns, puts AI agents inside every step from quote to cash, and turns the budget for an S/4HANA migration into a faster, more independent business.
All three wins, measured for this manufacturer.
Operational figures are targets and conservative planning assumptions, measured against your own baseline in Discovery.
| Measure | On SAP today | After the escape |
|---|---|---|
| Operations, with AI agents | ||
| Quote turnaround | Weeks, as spec review, design, and costing run in sequence | Days, with spec checks, design reuse, and pricing automated |
| Order lifecycle | About 128 weeks from request to payment | Target: 10+ weeks shorter |
| Plant output | Limited by monthly planning and reactive firefighting | 3% more from the same plant |
| Rework and defects | Found at final test | 25% less, caught during production |
| Cash | Invoices raised after milestones are chased | Paid 2 weeks sooner, releasing $7.7M once |
| Independence from SAP | ||
| Annual SAP fees | $1.1M, and rising | $0 after month 30 |
| Forced migrations | S/4HANA decision by December 2027 | None, ever |
| Making a change | A change request to an SAP integrator | Your platform, changed in days |
| Ownership | ||
| The software that runs the plant | Rented from SAP | Owned, with AI built in |
| Design knowledge | In engineers' heads and old files | A reusable design engine |
More orders than the plant can build.
A $200M power transformer and switchgear manufacturer on SAP ECC 6.0. It makes engineered switchgear and transformers, has about 1,000 employees, and runs SAP across finance, sales, projects, production, purchasing, quality, maintenance, warehousing, transport, and payroll. It has about 500 SAP users, $5M in net license value, and about $1.1M a year in maintenance. Demand is strong and the plant is the constraint. Mainstream maintenance ends in December 2027, so it has to choose a path.
Its SAP setup
Typical for an engineer-to-order energy equipment maker, based on SAP's documentation and published examples from Hitachi Energy, Maschinenfabrik Reinhausen, Siemens Energy, and ABB. The operational modules move to the owned platform across six waves, shown with their agents below. Finance (FI/CO) moves to a cloud finance product in year 2, and payroll (HCM) to a payroll service at the start of year 3. See where every module goes on the Escape Path page.
The 128-week order, and the 13 agents that shorten it.
A power transformer order now takes about 128 weeks from request for quote to payment, according to Wood Mackenzie. Much of that is physical: steel lead times, winding, and transit. The rest is waiting between steps, in queues, emails, and monthly planning cycles. Here is where each of the 13 agents removes that waiting, wave by wave.
Quotation
~8 weeksFrom request for quote to a priced offer
Order and final design
~6 weeksDesign locked, bill of materials released
Sourcing and materials
~30 weeksElectrical steel, copper, and components arrive
Manufacturing and test
~60 weeksCore, winding, assembly, and final test
Dispatch and payment
~24 weeksShipping, documents, delivery, and cash
Illustrative timeline for a power transformer order. Phase lengths are estimates that add up to the 128-week average lead time.
Quoting and configuration
Replaces SD quoting and variant configuration
- RFQ intake and validationChecks every request against IEEE C57 and IEC 60076 and your capability matrix, and returns a conformance report within 48 hours.1–3 weeks
- Design reuse and bill of materialsMatches the new spec to the closest past design in your PLM archive. Engineers approve every design.2–4 weeks
- Quote assembly and approvalPrices the bill of materials against current supplier and commodity prices, builds the quote, and routes it for approval.2–4 weeks
Project and production scheduling
Replaces scheduling in PS and PP
- Production schedulingReplaces the monthly planning cycle with a rolling schedule, and re-sequences in minutes when a machine goes down or a test fails.1–3 weeks
- Project milestone trackingWatches every engineered order against its milestones, and flags slippage while there is still time to act.Fewer surprises
Supplier tracking
Replaces expediting around MM
- Supplier commitment trackingTracks every critical component and supplier promise, and warns weeks ahead when electrical steel, copper, or bushings are at risk.Earlier warning
Orders and billing
Replaces SD orders and PS milestone billing
- Order changes and milestone billingApplies customer change orders consistently, and raises milestone invoices the day a milestone is confirmed.Days, not weeks
- CollectionsIssues the final invoice on delivery, tracks payment against terms, and escalates overdue accounts automatically.1–3 weeks of cash
Purchasing, inventory, and planning
Replaces MM purchasing and PP material planning
- Material planning and procurementRaises purchase orders the moment a design is locked, plans steel and copper 12–18 months ahead, and matches supplier invoices on receipt.1–2 weeks
Quality, maintenance, warehouse, and transport
Replaces QM, PM, WM, and TM
- Inbound inspectionChecks supplier test certificates before goods arrive, and decides pass, hold, or reject on receipt.3–5 days
- In-process and final test qualityUses shop-floor data and cameras to catch defects during winding, and flags borderline test results before final test. Needs shop-floor systems and camera hardware.1–3 weeks
- MaintenancePredicts when test bays, ovens, and winding machines need attention, so maintenance doesn't stop the line.Less downtime
- Export documents and logisticsPrepares commercial invoices, customs codes, and certificates of origin during final test, not after dispatch.2–4 weeks
$14.9M of new value in five years, from agents alone.
On deliberately conservative assumptions. Agent vendors often claim double-digit gains; we plan on a fraction of that and measure against your baseline.
| Lever | Agents | Conservative assumption | Yearly profit or saving |
|---|---|---|---|
| Ship more from the same plant | Production scheduling, milestone tracking, material planning | 3% more output from less waiting and fewer schedule disruptions3% of $200M = $6M × 25% | $1.5M |
| Price for reliable lead times | Quoting agents, scheduling, supplier tracking | 0.5% higher prices for faster, more reliable delivery dates0.5% of $200M | $1.0M |
| Less rework and fewer defects | Inbound inspection, in-process and final test quality | 25% less rework, on rework costing 1.5% of revenue$3M × 25% | $0.75M |
| Faster cash | Milestone billing, collections, export documents | Cash collected 2 weeks sooner, worth 8% a year in financing$7.7M released once × 8% | $0.6M |
| Less expediting | Supplier tracking, material planning | 30% less spent on expediting and premium freight, from $1M a year$1M × 30% | $0.3M |
| At full deployment, about | $4.2M a year | ||
Value builds wave by wave
Less than a migration over five years, and cheaper every year after.
Before counting any agent value, the Escape Path costs $1.7M–$5.2M less than migrating to S/4HANA over five years, and $4.3M–$7.8M less over ten years.
Migrate to S/4HANA
$7.5M–$11Mover five yearsA full migration, then SAP maintenance or subscription fees as before.
You end up with: a modern SAP system, the same per-user model, and fees of $1.1M or more every year.
Freeze ECC on third-party support
About $3.3Mover five yearsMove all of ECC to a third-party support provider and change nothing else.
You end up with: the lowest cost, but no new SAP releases, workflows frozen as they are today, and the full migration still ahead of you.
The Escape Path
About $5.8Mover five years, including our feesSix waves, run by two teams in parallel, rebuild every operational workflow with its own AI agents. Finance moves to a cloud finance product and payroll to a payroll service. SAP is switched off around month 30.
You end up with: no SAP at all, software you own for everything that runs the plant, and running costs of about $0.57M a year.
| Cost | A · Migrate | B · Freeze | C · Escape Path |
|---|---|---|---|
| SAP | |||
| SAP maintenance | 5.50 | 1.10 | 1.10 |
| Third-party support for ECC | – | 2.20 | 0.83 |
| S/4HANA migration, paid to a systems integrator | 2.00–5.50 | – | – |
| Archiving SAP data at switch-off | – | – | 0.23 |
| KaptureX | |||
| Discovery | – | – | 0.08 |
| Six waves (blueprint, build, parallel run) | – | – | 1.45 |
| Managed service | – | – | 0.48 |
| New platforms | |||
| Cloud hosting for the owned platform | – | – | 0.22 |
| Cloud finance: implementation and subscription | – | – | 0.58 |
| Payroll service: setup and subscription | – | – | 0.84 |
| Five-year total | 7.50–11.00 | 3.30 | 5.79 |
| Of which paid to vendor (e.g. KaptureX) | – | – | 2.00 |
| Yearly cost after year 5 | 1.10 or more | 0.55 | 0.57 |
| Ten-year cost | 13.0–16.5 | 6.05, plus the migration still ahead | 8.7 |
| New operating value from AI agents, five years | Not included | None | About 14.9 |
| Still ahead after year 5 | Future SAP upgrades | The full S/4HANA migration | Nothing from SAP |
| What you own | Nothing | Nothing | Every operational workflow |
The comparison, in plain terms
Against migrating, the Escape Path costs $1.7M–$5.2M less over five years (23–47%). For less than the price of a migration, you leave SAP entirely instead of renewing it, and your yearly running cost afterwards is about $0.57M instead of $1.1M or more.
Against freezing ECC, it costs about $2.5M more over five years. Freezing is cheapest in the short term, but it leaves every workflow as it is today and the full S/4HANA migration still to come.
You can also stop part-way. After the first three waves, the workflows that drive throughput are yours and the rest of SAP stays on third-party support, for about $4.5M over five years. Many companies start there, and decide on the full exit once the first waves have proven themselves.
Moving to third-party support is less of a one-way door than it was. Since July 2026, SAP waives the reinstatement fee for customers returning to SAP support, and caps back-maintenance at the lower of 50% of the fees for the time away or six months of payments.
How every number is calculated
Agent value: full-deployment value of about $4.15M a year, from 3% more output at a 25% contribution margin ($1.5M), 0.5% higher prices ($1.0M), 25% less rework on rework costing 1.5% of revenue ($0.75M), cash 2 weeks sooner at 8% financing ($0.6M), and 30% less expediting from $1M a year ($0.3M). It ramps at 15%, 55%, 90%, 100%, and 100% of that over years 1 to 5, for about $14.9M in total. The lead-time target adds the lower end of each agent's time target: about 10.6 weeks. All are planning assumptions to replace with your own baseline.
Ten-year view: migrating adds $1.1M a year of SAP fees for years 6 to 10. The Escape Path adds about $0.57M a year for cloud finance, payroll, managed service, hosting, and archiving.
Path A: maintenance at 22% of a $5M license ($1.1M a year, $5.5M over five years) plus a one-time migration of $2M–$5.5M, the range for 300–1,000 users. Post-migration subscription changes aren't included.
Path B: SAP maintenance of $1.1M in year 1, then third-party support at half the SAP fee ($550,000 a year) for years 2 to 5. Total about $3.3M.
Path C, year 1 ($1.70M): SAP maintenance ($1.1M), Discovery ($75,000), and waves 1 and 2 in parallel, quoting ($280,000) and scheduling ($220,000). Managed service and hosting for the first live workflows ($20,000).
Year 2 ($1.68M): SAP moves to third-party support ($550,000). Waves 3, 4, and 5: supplier tracking ($200,000), orders and billing ($250,000), and purchasing, inventory, and planning ($280,000). Finance moves to a cloud finance product ($250,000 to implement, $30,000 of subscription before year-end). Managed service and hosting ($120,000).
Year 3 ($1.26M): third-party support until switch-off around month 30 ($275,000). Wave 6, quality, maintenance, warehouse, and transport ($220,000). Payroll service from the start of the year ($50,000 setup, $264,000 a year). Cloud finance ($100,000). Managed service and hosting ($190,000). Archiving SAP data ($150,000 one-time, $15,000 for the rest of the year).
Years 4 and 5 ($0.57M each): cloud finance ($100,000), payroll service ($264,000), managed service ($120,000), hosting ($60,000), and archive storage ($30,000). Total about $5.8M, of which about $2.0M is paid to the vendor (e.g. KaptureX): $75,000 for Discovery, $1.45M for the six waves, and $475,000 for managed service over five years.
Parallel delivery: finishing in 30 months needs two delivery teams working at once, and a client team that can test and sign off two workflows at a time.
SAP users: about 500 named users: roughly 120 in sales and application engineering, 60 project and engineering managers, 110 in production planning and quality, 80 in purchasing and materials, 40 in finance, 30 in HR, and 60 managers who approve.
Not included: SAP licenses aren't cancelled in paths A or B, because SAP generally doesn't allow dropping licenses module by module. Hosting SAP itself and internal staff time are left out of every path; a full migration usually needs the most internal time, and the move to a payroll service usually reduces in-house payroll work.
Sources and assumptions: the SAP maintenance rate is from ERP Research and the migration range from VendorBenchmark. Third-party support at half the SAP fee follows provider claims: Rimini Street says up to 50%, and Spinnaker claims an average of 60%. The return-to-support terms are from SAP's support page. Cloud finance at about $100,000 a year for 40 users follows published estimates for mid-market cloud finance products such as NetSuite; finance-only implementations are estimated at $50,000–$350,000. The payroll service at $22 per employee per month follows published estimates for payroll-only plans from providers such as Paylocity. KaptureX fees, hosting, archiving, payroll setup, and the employee count are planning assumptions for illustration, not quotes. Wave fees include building the AI agents for each workflow, and the managed service includes AI model usage.
Find out what the escape is worth to your business.
Send us your SAP contract and license counts. In one to two weeks you'll have this analysis for your own plant: the five-year cost of migrating, freezing, and escaping, and where agents would earn the most.